Rigging up…
Wildcat‑1, onshore exploration well
0ft measured depth
Ready
Depth0ft
ROP0ft/h
Rig day0.0
Well cost₦0.00bn/ ₦9.3bn

Drag to orbit, scroll or pinch to zoom. Subsurface drawn at 1:40 of rig scale.

Onshore Niger Delta

Wildcat‑1

You are the driller. Watch the crew shoot a seismic survey and rig up, then take the well to the oil sand at 9,190 ft, case and cement it, perforate the pay and bring it on production. Stay in the sweet spot to build combos, catch kicks fast, and finish under budget.

Target depth9,190 ft
Budget (AFE)₦9.3bn
IncidentsZero
WS weight on bitAD rotary speedQE mud weightK shut inSpace pause